Thursday, 7 June 2012

Swim 19: Donnington bridge to Iffley lock. 16th january 2012


A glorious, sunny, and very cold january morning, saw the Thames group meet at the very same  Meadow lane car park off Donnington bridge road, as the previous swim. The changing conditions were crisp underfoot in the frozen mud and icy puddles, but we grinned away and got on with it as usual. We are a hardy bunch.


Fortunately for some of our swimmers, there were dressers on hand.



The group danced its way to the start point at the canoe club ramp where we had exited on the previous swim, looking like strange tellytubbies.


                              The temperature reader doesn't lie, a nice 4.1 degrees



The group photo, all looking a little sheepish at the thought of the cold.




and in we go.






The group stayed together for once at the start as it was too cold to put our faces in the water, but what a beautiful day.



Faces no longer numb the breakaway group steamed on ahead in an effort to keep warm, much to the annoyance of the rowers who were out in numbers today.


We approached the boat ramp at Iffley lock, swimming under the beautiful stone bridge.




Trudging through the mud soup underfoot, we emerged at Iffley lock into the warming sunshine.




                            Hot coffee provided by the wonderful bank support team.



                                      And finally a walk back along the route to Meadow lane car park.




Wonderful morning yet again, followed by lunch at the Isis farmhouse near Iffley lock.

Tuesday, 5 June 2012

Swim 26 Track - Clifton Lock to Day's Lock

Swim 26: Clifton Lock to Day's Lock

We met in the car park of the Barley Mo by the bridge in Clifton Hampden:

http://goo.gl/maps/4qdz

We changed into our swimming gear and put our warm clothes into a car which was shuttled down to a small parking area by the church in Little Wittenham:

http://goo.gl/maps/4f6E

We then walked across the bridge and upstream to the start point at Clifton Lock:

http://goo.gl/maps/YbZP

We then swam down to Day's Lock stopping for coffee and cakes at a small beach at about the half way mark:

http://goo.gl/maps/F8HL

At the time of writing, the ladders at Day's Lock were not in good condition so we exited the river shortly before the lock:

http://goo.gl/maps/sCF9

We then walked across the bridge to the church parking area to change back into our warm clothes before heading back to the Barley Mo along the Thames Path.  There's a shorter route along a road for the weary of leg.

This is a swim of 4.95km and is equivalent to swim 36 in I ♥ the Thames.

CAUTION:  Keep well left when approaching Day's Lock as there can be a strong current into the adjacent weir.

Swim 26 Map - Clifton Lock to Day's Lock


Monday, 4 June 2012

Swim 25 Track - Culham Lock to Clifton Lock

Swim 25: Culham Lock to Clifton Lock

We met in the same car park as Swim 24 next to Culham Lock:

http://goo.gl/maps/W3pN

We then changed into our swimming gear and put our warm clothes into a car which was shuttled down to a small car park next to Clifton Lock.


http://goo.gl/maps/A9JG

We then swam down from Culham Lock to Clifton Lock. There is a shortage of getting out spots along this stretch so be prepared to swim the distance. This is a swim of 4.6km and is equivalent to swim 35 in I ♥ the Thames. Remember to tell the lock keepers!

After swimming we had a spot of lunch at the Barley Mo by the bridge in Clifton Hampden before walking back down the Thames Path to our cars.

CAUTION: At approximately 3.6km there is a large weir on the right hand bank. This generates strong currents and is dangerous. Keep to the left.

Swim 25 Map - Culham Lock to Clifton Lock